Skip to content
SLM + DED · FLUID CONTROL
UNMANNED · FLUID CONTROL

Laboratory

Inspection connects the material, manufacturing process and delivered part with a documented acceptance plan.

Inspection connects the material, manufacturing process and delivered part with a documented acceptance plan.

Inspection methods and equipment

Metallography
Standard reference
GB/T 13298 / ASTM E3
Equipment
Inverted metallurgical microscope
Example acceptance reference
No visible pores / inclusions in the examined section
Tensile test
Standard reference
GB/T 228.1 / ASTM E8/E8M
Equipment
Universal testing machine
Example acceptance reference
Reference tensile strength ≥1050 MPa for the specified material condition
Penetrant examination (PT)
Standard reference
JB/T 9218 / ASME BPVC V
Equipment
Penetrant inspection system
Example acceptance reference
No linear indications; acceptance class confirmed in the inspection plan
Ultrasonic examination (UT)
Standard reference
ASME BPVC V
Equipment
Ultrasonic inspection system
Example acceptance reference
Proposal reference: no defect ≥Φ2 mm; technique and sensitivity agreed for the part
Dimensional inspection
Standard reference
ISO 10360
Equipment
Coordinate measuring machine
Example acceptance reference
±0.02 mm
Hardness
Standard reference
ASTM E18
Equipment
Rockwell hardness tester
Example acceptance reference
HRC 32–38
Flow calibration
Standard reference
ISO 5167
Equipment
Flow calibration bench
Example acceptance reference
Deviation ≤±5%

Additional capabilities in the company profile include industrial CT scanning and 3D scanning for dimensional reconstruction. Test selection and acceptance limits follow the material, heat treatment, geometry and customer specification. The example strength and hardness values do not apply to every alloy.

For non-pressure-retaining wear parts: valve trim, seats and sealing surfaces. Pressure-retaining components require project-specific qualification before acceptance.

UNMANNED

Start with the part. We will review the route.

Send the part type, material, damage and operating conditions. Our team will confirm suitability, the inspection plan and the delivery schedule.

Start Engineering Review