Operating conditions and original problem
A large iron-ore concentrator experienced slurry erosion and particle wear. Original trim lasted 4–6 months.
Technical approach
SLM creates integrated conformal flow channels, combined with a Stellite protective layer. The work concerns non-pressure-retaining trim.
Reported application result
The presentation reports continuous operation of at least 12 months and a cost reduction exceeding 50%.
Application example from the Unmanned SLM Fluid Control Technical Proposal, V3, 7 September 2026. Results describe the cited application; customer identity is not disclosed.
For non-pressure-retaining wear parts: valve trim, seats and sealing surfaces. Pressure-retaining components require project-specific qualification before acceptance.